Filling stations

naglowki_0001_modernizacja-stacji-zaladunku-kwasu-azotowego_f_1_600_0
We produce new (turnkey), or upgrade existing stations for filling and emptying transport containers which meet the requirements of the Ordinance of the Minister of Transport of 20 September 2006 on technical conditions of technical supervision, which should be fulfilled these devices.

  • The scope of the offer includes:
    complete technical documentation;
  • implementing projects in the sectors of building and construction, mechanical, electrical, technological, water, sewerage,
  • the preparation of environmental impact reports, investment proposals to obtain  technical requirements (WZiZT),decision on the environmental permit for the project, the project to obtain a building permit, agreed location in ZUD, obtaining maps for design purpose.
  • arrangements for building permit, fire fighting requirements, HSE, TDT, UDT and other required,
  • a full range of general construction works,
  • variety of dispensing systems.
  • absorption system and neutralization of vapors
  • batch control system with measurement of liquid dosing, shutoff valve and signaling,
  • conformity of the pressure elements to Pressure Equipment Directive 97/23 / EC,
  • conformity to the Directive 98/37 / EC.

catalog

POLIMER-POLSKA

Discover our comprehensive range of manufacturing and service Project Office.